Back
Knowledge

Coating drying time and good painting interval [table]

Abstract: 涂料的干燥时间和涂装间隔对涂装质量尤为重要。每道涂料需要在前一道涂层实际干燥后进行下一道涂装,涂装间隔时间受到涂料品种、施工温度和湿度等因素的影响。通常来讲,冬季应适当延长涂装间隔时间,而夏季则可适当缩短。很好的涂装间隔时间是指涂膜性能最佳时的涂装时间,需根据涂料品种和施工现场的具体情况来确定。为了确保良好的涂装效果,最好在推荐的涂装间隔时间内施工。实验室通常使用干燥时间测定仪来检测涂装干燥时间。常用的涂料干燥时间和涂装间隔信息详见下表。

When painting each Coating, a certain painting interval is required. The painting interval is not only related to the type of Coating, but also to the temperature, Humidity and other conditions during construction. Generally, the next painting is carried out after the actual drying of the previous coating. The painting interval can be appropriately extended in winter and shortened in summer.

A good painting interval refers to the most suitable painting interval when achieving good film performance. The determination of a good painting interval should be considered as appropriate according to the Coating variety and the specific conditions of the construction site. In order to achieve a good painting effect, construction should be done within a good painting interval as much as possible. Generally, laboratories use Drying time Recorder to detect painting drying time.

Coating drying time and painting interval are shown in the table below:

涂料的干燥时间和很好的涂装间隔[附表]配图1

Relevant knowledge
Guess you like it