| Coating method | dip coating |
| Power Supply | Single-phase AC220V +/- 10%, frequency 50Hz, power 9.5KW |
| gas source | 0.5~ 0.8MPa compressed air |
| type | Solution soaking (Note: After the substrate is crystallized in solution, it can be rolled around the tape) |
| material | Corrosion-resistant stainless steel (note that the solution cannot chemically react with the material) |
| quantity | 3 (1, 2 pools have heating function, 3 pools do not have heating function) |
| Heating method | Separate electromagnetic heating, power: about 3KW/piece, a total of about 6KW; (heating temperature depends on the characteristics of the solution and the environment) |
| Solution pool lift | Step-by-step control, you can control the stay position |
| solution lumen | Removable, manual injection/discharge of liquid (about 20L) |
| Width of guide roller | 200mm |
| Coating size | Max.180mm |
| mechanical speed | 0.1~300mm/min |
| Oven size | The length of a single section is 0.5m, a total of 1 section |
| Heating method | Electric heating, power about 1.5KW |
| Drying temperature | Max. 130 ℃, can be set |
| exhaust | Centrifugal fan, air Volume about 570 m 3 /h, power 200W, interface: 5-inch aluminum foil air duct |
| tension control | Max.60N |
| rewinding diameter | Max. Ф250mm |
| rewinding core | 3-Inch expansion shaft, load-bearing 50KG |
| Operation direction | Substrate transfer direction, the right side is the operation side |
| Device size | Coater: about L2400mm x W880mm x H1500mm (Note: the length of the equipment is divided into two sections) |
| Weight | Coater: about 1.3t |
Warranty days: 365 days
1. For product quality problems caused by non-human products of instruments and equipment, the manufacturer will provide free warranty services during the warranty period;
2. There is no warranty period for fragile and consumable parts, and if you find product quality problems after receiving the goods, please apply for return and exchange within 7 days, and you will not wait for the overdue ones;