China

BOZHEN BZH-2.5-12 Ash content measurement muffle furnace Ash content measurement of petroleum and plastic products 1200 ℃/2L

SE
BOZHEN BZH-2.5-12 ash determination muffle furnace is a box-type muffle furnace with high aluminum liner with good abrasion resistance, multi-faceted heating, BZH-2.5-12 ash determination muffle furnace is suitable for the determination of petroleum, plastic and other products ash.
$596.00/set
PromotionLoading...
Coupon
Model:

BoZhen BZH-2.5-12 Ash determination muffle furnaceSPEC

BoZhen BZH-2.5-12 Ash determination muffle furnaceDetails

BoZhen BZH-2.5-12 Ash determination muffle furnacePacking list

SKU
NB007736
maximum temperature
1200℃
Temperature range
100~1200℃
Heating Elements
resistance wire
Furnace material
high aluminum
Furnace Volume
2L
Heating power
2.5KW
Temperature control Accuracy
±2℃
Heating rate
≥10℃/min
Temperature control instrument
PID adjustment
Thermocouple
K Indexing Nickel Chromium - Nickel Silicon Thermocouple
Furnace size
200*120*80mm
Power
220V 50Hz
Dimensions
550*400*600mm
Product Weight
About 60KG
Temperature Resolution
1℃
BZH-2.5-12
Ash determination muffle furnace
BOZHEN BZH-2.5-12 Ash content measurement muffle furnace Ash content measurement of petroleum and plastic products 1200 ℃/2L Picture

Introduction

BZH-2.5-12 ash determination muffle furnace is suitable for determining the ash content of petroleum products and plastic products. It is designed and manufactured according to GB/T2433. Use ashless filter paper as the ignition core to ignite the sample placed in a suitable container to make it burn To the remaining carbon, the carbonaceous residue is converted into ash by heating in a high-temperature furnace at 775°C-900°C, and then cooled and weighed.

Features

1. The temperature controller adopts intelligent digital display temperature controller, which has professional PID control mode, double-row digital display microcomputer temperature control, with over-temperature alarm function, timing function, and accurate and reliable temperature control.

2. Independent temperature limit alarm, automatically interrupted when the temperature exceeds the limit, to ensure that the experiment is carried out safely without accidents.

Note: configuration functions can be added according to the customer's experimental requirements, program temperature control, fast ash, slow ash, users can modify the temperature and time of each heating section of ash content and volatile matter.

plan

Bozhen BZH-2.5-12 Ash Determination Muffle Furnace Display

Furnace structure and materials

Furnace shell material: the outer box shell is made of high-quality cold plate, which is treated with phosphoric acid film salt and sprayed at high temperature, and the color is computer gray;

Furnace material: high-aluminum liner is adopted, which has good wear resistance and heats up, down, left, and right sides of the high-temperature furnace;

Heat insulation method: insulation brick and insulation cotton;

Chimney: 304 stainless steel;

Temperature measuring port: The thermocouple enters from the upper rear of the furnace body;

Binding post: The heating furnace wire binding post is located at the rear and lower part of the furnace body;

Controller: located under the furnace body, built-in control system, the compensation wire is connected to the furnace body;

Heating element: high temperature resistance wire;

temperature control system

Temperature measurement: K-grading nickel-chromium-nickel-silicon thermocouple;

Control system: PID adjustment, display accuracy 1°C;

Complete set of electrical appliances: use brand contactors, cooling fans, solid state relays;

Time system: the working time can be set, the constant temperature time is reached, and the machine will stop automatically;

Over-temperature protection: Built-in secondary over-temperature protection device, double insurance. Over-temperature alarm, over-temperature cut-off;

Operation mode: full range adjustable constant temperature, constant operation.