ASTM F710-22 Standard Practice for Preparing Concrete Floors to Receive Resilience Flooring specifies the preparation steps and requirements for concrete flooring prior to the installation of resilience flooring. The standard details key aspects such as concrete floor cleaning, Smoothness, Humidity control and surface preparation to ensure that the ground meets the installation conditions of resilience flooring. By following this standard, cracking, warping, hollowing and other issues during the installation process can be effectively prevented, ensuring the long-term Stability and performance of resilience flooring. In addition, the standard also emphasizes the proper testing and inspection of concrete flooring to ensure that the installation environment reaches the excellent fit state of resilience flooring. This provides clear guidance for flooring installation companies to help improve construction mass and extend flooring life.
| Status | Active |
|---|---|
| CCS | ICS | 97.150 |
| Release Date | 2022-12-15 00:00:00 | Implementation Date |