Status
All Active Abolish Replaced Incoming Convert to industry standard
Category
Number Year
Name

GB 7693-1987 《Painting work safety regulations, painting pre-treatment process ventilated purification》 Related products

GB 7693-1987 "Safety procedures for painting operations, ventilating and purifying the pre-painting process" stipulates the ventilating and purifying requirements for the pre-painting process, mainly for the treatment of indoor ferrous metal workpieces. The standard covers measures to ensure safe and hygienic working conditions, including the design and maintenance of ventilating systems, to protect the health of workers and prevent the accumulation of harmful substances and their impact on the environment. The treatment of outdoor and Miscellaneous material workpieces can be implemented with reference to this standard.

This summary is not the original standard text and is for reference only. For accurate information, please obtain it through official channels.
Status Abolish
CCS
ICS
Release Date
Implementation Date
Sort Filter
No information related to was found
Extended reading