All Humidity tTest Chamber
Status
All Active Abolish Replaced Incoming Convert to industry standard
Category
Number Year
Name

GB/T 34120-2023 《Technical requirements for power conversion system of electrochemical energy storage system》 Related products

This document specifies the functional requirements of energy storage converters for electrochemistry energy storage systems, including start-stop, Power control, off-grid switching, alarm and protection, communication, etc., as well as performance requirements and Miscellaneous requirements. Applicable to the design, manufacture, testing, testing, operation, maintenance and overhaul of energy storage converters with electrochemistry batteries as energy storage carriers and AC port voltages of 35kV and below. A series of relevant standards are quoted, such as the standards for housing Protection level, power mass, etc., and the terms and definitions of DL/T 2528 are adopted.

This summary is not the original standard text and is for reference only. For accurate information, please obtain it through official channels.
Status Active
CCS F19
ICS 27.180
Release Date 2023-12-28 00:00:00
Implementation Date 2024-07-01 00:00:00
Sort Filter
Extended reading